Technical Information



Gas Properties


1.0 Physical Properties of ANS gaspdf file 8/27/10 Current


Pipeline Hydraulic Simulations

    12i Pressure Drop Chart - Simplepdf file 11/14/10 Current

       Case 1 - Prudhoe Bay to North Pole
       514 Miles - 12 inch - 19Bcf/year


 -   Case 1 - 12in. (no compressor) Chartpdf file 1/26/11 Current
 -   Case 1 - 12in. (no compressor) Reportpdf file 2/15/11 Current
 -   Case 1 - 12in. (with compressor) Chartpdf file 1/26/11 Current
 -   Case 1 - 12in. (with compressor) Reportpdf file 2/15/11 Current

       Case 2 - Prudhoe Bay to Livengood Hub to North Pole
       514 Miles - 18 inch - 19Bcf/year


 -   Case 2 - 18in. (no compressor) Chartpdf file 1/26/11 Current
 -   Case 2 - 18in. (no compressor) Reportpdf file 2/15/11 Current
 -   Case 2 - 18in. (with compressor) Chartpdf file 1/26/11 Current
 -   Case 2 - 18in. (with compressor) Reportpdf file 2/15/11 Current

       Case 2A - Prudhoe Bay to Livengood Hub: 424 Miles - 18 inch - 91Bcf/year
                       Livengood Hub to North Pole: 90 Mile - 12 inch - 19Bcf/year
                       Livengood Hub to Cook Inlet: 328 Mile - 18 inch - 72Bcf/year


 -   Case 2A - 18in. Livengood (with compressor) Chartpdf file 1/28/11 Current
 -   Case 2A - 18in. Livengood (no compressor) Chartpdf file 1/28/11 Current
 -   Case 2A - 18in. Livengood (with compressor) Reportpdf file 1/28/11 Current


Compression


2.0 CGF-CCP Facility Descriptionpdf file 2/26/04 Dated, but pertinent
3.0 CGF – CCP Capacity Detailspdf file 2/26/04 Dated, but pertinent
4.0 North Slope Separation Facilities Fact Sheetpdf file 8/9/06 Dated, but pertinent


FPC Compression


5.0
FPC compression options (pending content)


Line Pipe:


- Primary Transmission Segments (pending content)


- Secondary Transmission Segments
-   Coiled Flow-Line Logistic Informationpdf file 6/22/10 Current


Pipeline Construction


 


NGLs - Natural Gas Liquids


 


Synthesis - Conversion of Gas to Liquids